Great Stone Industrial Park
Land plots available for private ownership and long-term lease for up to 99 years
Submit your application
Ready to use transport and utilities infrastructure
The park’s first stage of development comprises an area of 850 hectares (representing c.7% of the park’s total area), on this site, all necessary utilities, transport, production and office infrastructure has been completed.
50 MW
Electrical substation
30 km
Roads and highways
310 km
Utility networks
6
Artesian wells
Ready-to-use infrastructure
General plan
Electricity
33 km
electrical cabling
10
distribution substations with voltage, 10 kV
30
transformer substations with voltage, 10/0.4 kV
Water supply
37 км
water pipelines
14,780 m3/day
capacity of the pumping station
6
wells with a depth of 56-85 m
Wastewater
64 км
pipelines for domestic wastewater and rainwater
13,154 m3/day
capacity of treatment facilities for domestic wastewater, equipped with deep wastewater treatment technology
663.5 L/sec
capacity of the rainwater treatment plant
Gas
13 km
gas supply pipelines
Communications
27 km
communication networks
Individual selection of land plots
Individual approach to your business
We will select the size of the plot and its location based on your wishes and in accordance with the needs of your business.
Selection of a plot is dependent on your businesses’ size and location requirements.
Selection of a plot is dependent on your businesses’ size and location requirements.
All utilities necessary for production run along the boundaries of the land plots.
- electricity
- water supply
- wastewater
- gas
- communications
DETAILED MAP OF THE PLOT
Area
Land plots from 1 ha
Ready transport and utilities infrastructure
More than 30 km of roads, more than 300 km of engineering networks have been built
Electricity
Electric substation 50 MW for the park’s first stage of the development
Ready social and administrative infrastructure
Office building, investor service center, R&D center, logistics center, customs clearance point, fire station, residential building, post office, and bank within the park’s territory
Preferences
Tax, customs and administrative preferences for residents of the industrial park
Logistics
The park is located 30 km from Minsk with access to the international highway, Moscow-Berlin (M1 / E30)
How to obtain a land plot
Step
1
1
Become a park resident
Step
2
2
Submit an application to the Industrial Park Development Company regarding the desired area
Step
3
3
Sign a lease or purchase agreement with the Industrial Park Development Company for the land plot